Skip to content
SANSENDMAY

Six scenarios. One engineering method.

We start from the load, the weather and the service route — then choose the hardware. Never the other way round.

Process / 交付流程

How an engagement runs

A sizing call, a configuration document and a factory acceptance test. Most projects move from enquiry to shipped container in six to eight weeks.

Step 01

Sizing call

Load profile, tariff, site latitude.

Step 02

Configuration

Single-line drawing and landed price.

Step 03

Acceptance

Four-hour cycle report per unit.

Talk to an engineer
Solutions — Sansend May